top of page

Sick of construction delays, cost overruns and quality issues - but not sure which potential alternative methods to consider? Volumetric, Flatpack, DfMA or simply good traditional etc?

We bring together decades of experience in Industrialised Construction, MMC, DfMA, MiC, Advanced Precast etc and traditional projects and system development from different sectors.

We offer conversion studies, optimisation reviews and full detailed designs and integration to factory processes.

Conversions to Industrialised Construction

Method Optimisation

Programme Acceleration

Untitled design.png

Estamos formando equipos en México y Colombia para apoyar al sector de construcción en Latinoamérica. No dude en contactarnos si le interesa una opinión de como mejorar de forma holística su proceso constructivo.

edit (60).jpg

2025-12-01: HV-E appointed to join the expert team of Grants of Shoreditch for Specialist Engineering & Detailing of the precast façade at 125 Shaftsbury Avenue for Edge delivered by SRM. ( General project info by Edge: https://edge.tech/portfolio/edge-shaftesbury )

2025-11-13: Thank you to BIMLUX for inviting us as presenters for your event!

2025-11-03: Congratulations to Vetter and Explore for the successful fabrication and start of installation of the extremely complex precast façade at Littlemore House / Ellison Institute! Thank you for the opportunity of participating in the temporary works design for this exciting project including its many feature elements. (General project info by LOR: Laing O’Rourke set to deliver Ellison Institute of Technology Oxford | Laing O’Rourke )

bottom of page