top of page

MMC & DfMA Specialists

Modern Methods of Construction

Modular Integrated Construction

Advanced Precast

Volumetric, Flatpack/2d, Hybrid

Ceiling Modules, Smartwalls, Pods, Plantframes, Riser and Corridor Modules etc

Industrialised Construction

Modular and Hybrid

Acceleration Options

Screenshot 2026-01-12 at 20.12.17.png
Screenshot 2026-01-12 at 20.12.34.png
Screenshot 2026-01-12 at 20.12.51.png
Screenshot 2026-01-12 at 20.13.12.png

Alternative construction method studies in early design phases on behalf of client or architect.

Specialist support to contractors e.g. during tenders, early contractor involvement or PCSA’s, sequencing.

Full design, engineering and fabrication detailing for selected modular packages. 

edit (60).jpg

2026-04-01: We welcome Suyeun Song (Associate) and Youna Choi (Senior DfMA Architect) to our team and looking forward to working together!

2026-03-02: Thank you to the Sisk team for the opportunity to join your team to finalise parts of the façade design at the extension of the Manchester City Stadium. Sisk top tier ambition in full flow at Etihad Stadium | Sisk

2026-02-26: Starting another project with GBA and Elton GRC at Oxford Station. Thank you for the opportunity. (6) Post | Feed | LinkedIn

bottom of page