Full design, specialist engineering and fabrication detailing of precast structures including connections.
Conventionally reinforced, prestressed, post-tensioned structures.
Temporary works design, demould, pitching, lifting and handling design.
Scheduling and construction sequencing.





Rapid Precast/DfMA Conversions
Optimisation
Integrated Permanent & Temporary
Works Design
2026-04-01: We welcome Suyeun Song (Associate) and Youna Choi (Senior DfMA Architect) to our team and looking forward to working together!
2026-03-02: Thank you to the Sisk team for the opportunity to join your team to finalise parts of the façade design at the extension of the Manchester City Stadium. Sisk top tier ambition in full flow at Etihad Stadium | Sisk
2026-02-26: Starting another project with GBA and Elton GRC at Oxford Station. Thank you for the opportunity. (6) Post | Feed | LinkedIn


.jpg)
.jpg)
.jpg)
.jpg)